FCC ID 2A8MT-AP6
2x2 Dual-band Enterprise Access Point
by SoundVision Technologies, dba Alta Labs
Grantee Code: 2A8MT Product Code: AP6
Latest application date: 2023-05-02
FCC ID Device Details
| FCC ID | 2A8MT-AP6 |
|---|---|
| Mirrors | fcc.id | gov | fccid.ai |
| Grantee Code | 2A8MT |
| Product Code | AP6 |
| Applicant Business | SoundVision Technologies, dba Alta Labs 🇺🇸 |
| Related Domains | |
| Equipment Class | 2x2 Dual-band Enterprise Access Point |
| Test Firm | Sporton International Inc. Hsinhua Laboratory |
Operating Frequencies
| Frequency Range | Application Purpose | Final Action Date |
|---|---|---|
| 5745-5825 MHz | Class II permissive change or modification of presently authorized equipment | 2023-05-02 |
| 2402-2480 MHz | Original Equipment | 2023-04-07 |
| 5745-5825 MHz | Original Equipment | 2023-04-07 |
| 2402-2480 MHz | Original Equipment | 2023-04-07 |
Exhibits
| Document | Type | Available | File |
|---|---|---|---|
| User Manual | Users Manual | 2023-10-04 | PDF 4.3 MB |
| Internal Photos Antenna | Internal Photos | 2023-10-29 | PDF 485.1 KB |
| Internal Photos | Internal Photos | 2023-10-04 | PDF 1.2 MB |
| External Photos | External Photos | 2023-10-04 | PDF 439.5 KB |
| Label | ID Label/Location Info | 2023-04-07 | PDF 119.6 KB |
| TSUP 5G | Test Setup Photos | 2023-10-29 | PDF 777.2 KB |
| TSUP Antenna Metadata only | Test Setup Photos | 2023-10-29 | PDF 485.1 KB |
| TSUP DFS | Test Setup Photos | 2023-10-29 | PDF 181.1 KB |
| TSUP 2.4G | Test Setup Photos | 2023-10-04 | PDF 1.1 MB |
| TSUP 5G | Test Setup Photos | 2023-10-04 | PDF 1.1 MB |
| TSUP EDR | Test Setup Photos | 2023-10-04 | PDF 1.1 MB |
| TSUP LE | Test Setup Photos | 2023-10-04 | PDF 1.1 MB |
| Test Report 5G | Test Report | 2023-05-02 | PDF 5.7 MB |
| Test Report Antenna | Test Report | 2023-05-02 | PDF 1.3 MB |
| Test Report DFS | Test Report | 2023-05-02 | PDF 3.7 MB |
| Test Report 2.4G | Test Report | 2023-04-07 | PDF 4.4 MB |
| Test Report 5G | Test Report | 2023-04-07 | PDF 5.8 MB |
| Test Report EDR | Test Report | 2023-04-07 | PDF 3.2 MB |
| Test Report LE | Test Report | 2023-04-07 | PDF 3.5 MB |
| Attestation Statement part 2.911(d)(7) | Attestation Statements | 2023-05-02 | PDF 96.6 KB |
| Attstn Stmt part 2.911(d)(5)(i)&(ii) | Attestation Statements | 2023-05-02 | PDF 84.7 KB |
| Attstn Stmt Part 2.911(d)(5)(i) | Attestation Statements | 2023-04-07 | PDF 88.7 KB |
| Attstn Stmt part 2.911(d)(5)(i) | Attestation Statements | 2023-04-07 | PDF 88.7 KB |
| Attstn Stmt part 2.911(d)(5)(ii) | Attestation Statements | 2023-04-07 | PDF 88.4 KB |
| SDOC Attestation Letter | Attestation Statements | 2023-04-07 | PDF 88.4 KB |
| C2PC Letter | Cover Letter(s) | 2023-05-02 | PDF 104.7 KB |
| Confidentiality Letter | Cover Letter(s) | 2023-05-02 | PDF 153.7 KB |
| LOA Letter | Cover Letter(s) | 2023-05-02 | PDF 105.2 KB |
| Confidentiality Letter | Cover Letter(s) | 2023-04-07 | PDF 97.7 KB |
| Grant Deferral Letter | Cover Letter(s) | 2023-04-07 | PDF 241.6 KB |
| Grant Deferral Request | Cover Letter(s) | 2023-04-07 | PDF 241.6 KB |
| LOA Letter | Cover Letter(s) | 2023-04-07 | PDF 94.9 KB |
| RF Exposure MPE | RF Exposure Info | 2023-05-02 | PDF 334 KB |
| RF Exposure MPE | RF Exposure Info | 2023-04-07 | PDF 421.5 KB |
| Block Diagram Metadata only | Block Diagram | PDF 393.3 KB | |
| Block Diagrams Metadata only | Block Diagram | PDF 393.3 KB | |
| Operational Description Metadata only | Schematics | PDF 941.6 KB | |
| Schematics Metadata only | Schematics | PDF 1.6 MB | |
| Operational Description Metadata only | Operational Description | PDF 625.3 KB | |
| Op Desc Software Security Metadata only | SDR Software/Security Inf | PDF 33.8 KB |
Application Information
| Application ID | N6jRMnNNjN6X7PLPMy14PQ== |
|---|---|
| Final Action Date | 2023-05-02 |
| Application Purpose | Class II permissive change or modification of presently authorized equipment |
| Applicant FRN | 0032858888 |
| Model | AP6 |
| Frequency Range | 5745-5825 MHz |
| Equipment Class | NII - Unlicensed National Information Infrastructure TX |
| Device Description | 2x2 Dual-band Enterprise Access Point |
| Responsible Party | Jeff Hansen, CTO, jeff@soundvisiontech.com |
| Test Firm | Alex Chen, Sporton International Inc. Hsinhua Laboratory, alex@sporton.com.tw |
| TCB Email | tei@timcoengr.com |
| TCB Scope | A4: UNII devices & low power transmitters using spread spectrum techniques |
| Short-Term Confidentiality | Yes |
| Short-Term Confidentiality Date | 10/29/2023 |
| Long-Term Confidentiality | Yes |
| Grant Deferral | No |
| Modular Equipment | Does not apply |
| Composite Device | Yes |
| Composite Part | No |
| Cognitive Radio | No |
| Authorization Waiver | No |
| Authorization Waiver Approved | No |
| Section 5301 Certification | Yes |
| Related OET Knowledge DataBase Inquiry | Yes |
| Grant Comments | Class II change adding DFS Bands. Output Power listed is the maximum conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. This device supports 20, 40, 80 and 160 MHz modes. |
Applications
| Application ID | Date | Purpose |
|---|---|---|
| N6jRMnNNjN6X7PLPMy14PQ== | 2023-05-02 | Class II permissive change or modification of presently authorized equipment |
| gISN58wYWaa0yQVbQHcdAA== | 2023-04-07 | Original Equipment |
| bUR5MWhFqPUFGv/PwpbhOQ== | 2023-04-07 | Original Equipment |
| PzM+u15WV7b7Bbtqnuix6Q== | 2023-04-07 | Original Equipment |
Equipment Authorization
Grants
TCB Grant - Application PzM+u15WV7b7Bbtqnuix6Q==
| TCB | GRANT OF EQUIPMENT AUTHORIZATION |
TCB |
| Certification | ||
| Issued Under the Authority of the | ||
| Federal Communications Commission | ||
| By: |
|
Timco Engineering, Inc. 849 NW State Road 45 Newberry, FL 32669 |
Date of Grant: 04/07/2023 Application Dated: 03/31/2023 |
| SoundVision Technologies, dba Alta Labs |
| 192 N Old Hwy 91, Unit 1 |
| Hurricane, UT 84737 |
| Attention: Jeff Hansen , CTO |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | 2A8MT-AP6 |
| Name of Grantee: | SoundVision Technologies, dba Alta Labs |
| Equipment Class: | Digital Transmission System |
| Notes: | 2x2 Dual-band Enterprise Access Point |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| CC | 15C | 2402.0 - 2480.0 | 0.0071 | ||
| CC MO | 15C | 2412.0 - 2462.0 | 0.3041 |
| Output Power listed is the maximum conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. This device supports 20 and 40 MHz modes. |
| CC: | This device is certified pursuant to two different Part 15 rules sections. |
| MO: | This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing. |
EAS Grant - Application PzM+u15WV7b7Bbtqnuix6Q==
| COPY |
FEDERAL COMMUNICATIONS COMMISSION WASHINGTON, D.C. 20554 GRANT OF EQUIPMENT AUTHORIZATION |
COPY |
| Certification |
|
SoundVision Technologies, dba Alta Labs 192 N Old Hwy 91, Unit 1 Hurricane, UT 84737 United States |
Date of Grant: 04/07/2023 Application Dated: 03/31/2023 |
| Attention: Jeff Hansen , CTO |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | 2A8MT-AP6 |
| Name of Grantee: | SoundVision Technologies, dba Alta Labs |
| Equipment Class: | Digital Transmission System |
| Notes: | 2x2 Dual-band Enterprise Access Point |
| Modular Type: | Does not apply |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| CC | 15C | 2402.0 - 2480.0 | 0.0071 | ||
| CC MO | 15C | 2412.0 - 2462.0 | 0.3041 |
| Output Power listed is the maximum conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. This device supports 20 and 40 MHz modes. |
| CC: | This device is certified pursuant to two different Part 15 rules sections. |
| MO: | This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing. |
| Mail To: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TCB | GRANT OF EQUIPMENT AUTHORIZATION |
TCB |
| Certification | ||
| Issued Under the Authority of the | ||
| Federal Communications Commission | ||
| By: |
|
Timco Engineering, Inc. 849 NW State Road 45 Newberry, FL 32669 |
Date of Grant: 05/02/2023 Application Dated: 04/26/2023 |
| SoundVision Technologies, dba Alta Labs |
| 192 N Old Hwy 91, Unit 1 |
| Hurricane, UT 84737 |
| Attention: Jeff Hansen , CTO |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | 2A8MT-AP6 |
| Name of Grantee: | SoundVision Technologies, dba Alta Labs |
| Equipment Class: | Unlicensed National Information Infrastructure TX |
| Notes: | 2x2 Dual-band Enterprise Access Point |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| CC MO | 15E | 5180.0 - 5240.0 | 0.6209 | ||
| CC MO | 15E | 5260.0 - 5320.0 | 0.241 | ||
| CC MO | 15E | 5500.0 - 5720.0 | 0.2483 | ||
| CC MO | 15E | 5745.0 - 5825.0 | 0.9728 |
| Class II change adding DFS Bands. Output Power listed is the maximum conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. This device supports 20, 40, 80 and 160 MHz modes. |
| CC: | This device is certified pursuant to two different Part 15 rules sections. |
| MO: | This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing. |
EAS Grant - Application N6jRMnNNjN6X7PLPMy14PQ==
| COPY |
FEDERAL COMMUNICATIONS COMMISSION WASHINGTON, D.C. 20554 GRANT OF EQUIPMENT AUTHORIZATION |
COPY |
| Certification |
|
SoundVision Technologies, dba Alta Labs 192 N Old Hwy 91, Unit 1 Hurricane, UT 84737 United States |
Date of Grant: 05/02/2023 Application Dated: 04/26/2023 |
| Attention: Jeff Hansen , CTO |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | 2A8MT-AP6 |
| Name of Grantee: | SoundVision Technologies, dba Alta Labs |
| Equipment Class: | Unlicensed National Information Infrastructure TX |
| Notes: | 2x2 Dual-band Enterprise Access Point |
| Modular Type: | Does not apply |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| CC MO | 15E | 5180.0 - 5240.0 | 0.6209 | ||
| CC MO | 15E | 5260.0 - 5320.0 | 0.241 | ||
| CC MO | 15E | 5500.0 - 5720.0 | 0.2483 | ||
| CC MO | 15E | 5745.0 - 5825.0 | 0.9728 |
| Class II change adding DFS Bands. Output Power listed is the maximum conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. This device supports 20, 40, 80 and 160 MHz modes. |
| CC: | This device is certified pursuant to two different Part 15 rules sections. |
| MO: | This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing. |
| Mail To: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TCB | GRANT OF EQUIPMENT AUTHORIZATION |
TCB |
| Certification | ||
| Issued Under the Authority of the | ||
| Federal Communications Commission | ||
| By: |
|
Timco Engineering, Inc. 849 NW State Road 45 Newberry, FL 32669 |
Date of Grant: 04/07/2023 Application Dated: 03/31/2023 |
| SoundVision Technologies, dba Alta Labs |
| 192 N Old Hwy 91, Unit 1 |
| Hurricane, UT 84737 |
| Attention: Jeff Hansen , CTO |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | 2A8MT-AP6 |
| Name of Grantee: | SoundVision Technologies, dba Alta Labs |
| Equipment Class: | Part 15 Spread Spectrum Transmitter |
| Notes: | 2x2 Dual-band Enterprise Access Point |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| CC | 15C | 2402.0 - 2480.0 | 0.0169 |
| Output Power listed is the maximum conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. |
| CC: | This device is certified pursuant to two different Part 15 rules sections. |
EAS Grant - Application gISN58wYWaa0yQVbQHcdAA==
| COPY |
FEDERAL COMMUNICATIONS COMMISSION WASHINGTON, D.C. 20554 GRANT OF EQUIPMENT AUTHORIZATION |
COPY |
| Certification |
|
SoundVision Technologies, dba Alta Labs 192 N Old Hwy 91, Unit 1 Hurricane, UT 84737 United States |
Date of Grant: 04/07/2023 Application Dated: 03/31/2023 |
| Attention: Jeff Hansen , CTO |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | 2A8MT-AP6 |
| Name of Grantee: | SoundVision Technologies, dba Alta Labs |
| Equipment Class: | Part 15 Spread Spectrum Transmitter |
| Notes: | 2x2 Dual-band Enterprise Access Point |
| Modular Type: | Does not apply |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| CC | 15C | 2402.0 - 2480.0 | 0.0169 |
| Output Power listed is the maximum conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. |
| CC: | This device is certified pursuant to two different Part 15 rules sections. |
| Mail To: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TCB | GRANT OF EQUIPMENT AUTHORIZATION |
TCB |
| Certification | ||
| Issued Under the Authority of the | ||
| Federal Communications Commission | ||
| By: |
|
Timco Engineering, Inc. 849 NW State Road 45 Newberry, FL 32669 |
Date of Grant: 04/07/2023 Application Dated: 03/31/2023 |
| SoundVision Technologies, dba Alta Labs |
| 192 N Old Hwy 91, Unit 1 |
| Hurricane, UT 84737 |
| Attention: Jeff Hansen , CTO |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | 2A8MT-AP6 |
| Name of Grantee: | SoundVision Technologies, dba Alta Labs |
| Equipment Class: | Unlicensed National Information Infrastructure TX |
| Notes: | 2x2 Dual-band Enterprise Access Point |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| CC MO | 15E | 5180.0 - 5240.0 | 0.6209 | ||
| CC MO | 15E | 5745.0 - 5825.0 | 0.9728 |
| Output Power listed is the maximum conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. This device supports 20, 40 and 80 MHz modes. |
| CC: | This device is certified pursuant to two different Part 15 rules sections. |
| MO: | This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing. |
EAS Grant - Application bUR5MWhFqPUFGv/PwpbhOQ==
| COPY |
FEDERAL COMMUNICATIONS COMMISSION WASHINGTON, D.C. 20554 GRANT OF EQUIPMENT AUTHORIZATION |
COPY |
| Certification |
|
SoundVision Technologies, dba Alta Labs 192 N Old Hwy 91, Unit 1 Hurricane, UT 84737 United States |
Date of Grant: 04/07/2023 Application Dated: 03/31/2023 |
| Attention: Jeff Hansen , CTO |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | 2A8MT-AP6 |
| Name of Grantee: | SoundVision Technologies, dba Alta Labs |
| Equipment Class: | Unlicensed National Information Infrastructure TX |
| Notes: | 2x2 Dual-band Enterprise Access Point |
| Modular Type: | Does not apply |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| CC MO | 15E | 5180.0 - 5240.0 | 0.6209 | ||
| CC MO | 15E | 5745.0 - 5825.0 | 0.9728 |
| Output Power listed is the maximum conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. This device supports 20, 40 and 80 MHz modes. |
| CC: | This device is certified pursuant to two different Part 15 rules sections. |
| MO: | This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing. |
| Mail To: |