FCC ID 2ACLT-DRU2KW

2KW Satellite Dual Repeater Unit

by Unique Broadband Systems Ltd.

Grantee Code: 2ACLT   Product Code: DRU2KW
Latest application date: 2015-09-16

Device Images

FCC ID Device Details

FCC ID2ACLT-DRU2KW
Mirrorsfcc.id | gov | fccid.ai
Grantee Code2ACLT
Product CodeDRU2KW
Applicant BusinessUnique Broadband Systems Ltd. 🇨🇦
Related Domains uniquesys.com
Equipment Class2KW Satellite Dual Repeater Unit
Test FirmUltraTech Engineering Labs Inc.

Operating Frequencies

Frequency RangeApplication PurposeFinal Action Date
2326.25 MHzOriginal Equipment2015-09-16

Exhibits

DocumentTypeAvailableFile
User ManualUsers Manual2015-09-16PDF 2.8 MB
User Manual 2Users Manual2015-09-16PDF 1.3 MB
Internal Photos 1Internal Photos2015-09-16PDF 5.2 MB
Internal Photos 2Internal Photos2015-09-16PDF 5.8 MB
Internal Photos 3Internal Photos2015-09-16PDF 5.3 MB
Internal Photos 4Internal Photos2015-09-16PDF 3.2 MB
Internal Photos_HBEInternal Photos2015-09-16PDF 3.6 MB
Internal Photos_LBEInternal Photos2015-09-16PDF 4.5 MB
External PhotosExternal Photos2015-09-16PDF 1.8 MB
Label & LocationID Label/Location Info2015-09-16PDF 2.3 MB
Setup PhotosTest Setup Photos2015-09-16PDF 728.2 KB
Test ReportTest Report2015-09-16PDF 807.1 KB
Manufacturer AttestationAttestation Statements2015-09-16PDF 47.8 KB
Part 15B AttestationAttestation Statements2015-09-16PDF 39.7 KB
Authority LetterCover Letter(s)2015-09-16PDF 45.7 KB
Confidentiality LetterCover Letter(s)2015-09-16PDF 46.2 KB
Cover LetterCover Letter(s)2015-09-16PDF 87.3 KB
Third Party Confd Request_HBECover Letter(s)2015-09-16PDF 333.1 KB
Third Party Confd Request_LBECover Letter(s)2015-09-16PDF 331.7 KB
Tune-up InfoParts List/Tune Up Info2015-09-16PDF 37.8 KB
Block Diagram Metadata onlyBlock DiagramPDF 408.7 KB
Block Diagram_HBE Metadata onlyBlock DiagramPDF 88.8 KB
Block Diagram_LBE Metadata onlyBlock DiagramPDF 70.7 KB
Schematics Metadata onlySchematicsPDF 2.5 MB
Schematics 1_HBE Metadata onlySchematicsPDF 3.4 MB
Schematics 2_HBE Metadata onlySchematicsPDF 3.8 MB
Schematics_LBE Metadata onlySchematicsPDF 2.3 MB
Operation Description Metadata onlyOperational DescriptionPDF 1.7 MB
Operation Description_HBE Metadata onlyOperational DescriptionPDF 22.3 KB
Operation Description_LBE Metadata onlyOperational DescriptionPDF 27.1 KB
Parts List Metadata onlyParts List/Tune Up InfoPDF 205.8 KB
Parts List_HBE Metadata onlyParts List/Tune Up InfoPDF 194 KB
Parts List_LBE Metadata onlyParts List/Tune Up InfoPDF 236.1 KB

Application Information

Application IDI7o/6lxvR61onBJrWwMYCw==
Final Action Date2015-09-16
Application PurposeOriginal Equipment
Applicant FRN0023385875
ModelDRU2KW
Frequency Range2326.25 MHz
Equipment ClassTNB - Licensed Non-Broadcast Station Transmitter
Device Description2KW Satellite Dual Repeater Unit
Responsible PartyCatalin Popescu, Project Manager, Systems Engineer, catalinp@uniquesys.com , 905-669-8533
AgentDharmajit Dharmajit Dharmajit, UltraTech Engineering Labs Inc, dharmajit@ultratech-labs.com , 9058291570
Test FirmTri Luu, UltraTech Engineering Labs Inc., tri@ultratech-labs.com , 905-829-1570
TCB Emailvic@ultratech-labs.com
TCB ScopeB1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
Short-Term ConfidentialityNo
Long-Term ConfidentialityYes
Grant DeferralNo
Modular EquipmentDoes not apply
Composite DeviceNo
Composite PartNo
Cognitive RadioNo
Authorization WaiverNo
Authorization Waiver ApprovedNo
Section 5301 CertificationYes
Related OET Knowledge DataBase InquiryNo
Grant CommentsPower output is RF conducted. Final antenna installation and operating configurations of this transmitter including antenna gain and cable loss must not exceed the EIRP requirements of 25.214(d). The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. Site-by-site basis requires RF exposure compliance be addressed at the time of licensing, as required by the responsible FCC bureau(s), including antenna co-location requirements of §1.1307 (b)(3). Blanket license operation of SDARS terrestrial repeaters requires operators to maintain demonstration of compliance with Part 1, Subpart I, of this chapter and make such demonstrations available to the commission upon request within three business days.

Applications

Application IDDatePurpose
I7o/6lxvR61onBJrWwMYCw==2015-09-16Original Equipment

Equipment Authorization

FrequencyOutputToleranceEmissionRulesGrant Notes
2326.25 MHz17408.000E-7%3M81W1W2568
2326.256 MHz2.758.000E-7%20K8W1W2568
2338.755 MHz17403.000E-7%4M98W1W2568

Grants

TCB Grant - Application I7o/6lxvR61onBJrWwMYCw==

TCB GRANT OF EQUIPMENT
AUTHORIZATION
TCB
Certification
Issued Under the Authority of the
Federal Communications Commission
By:

  Ultratech Engineering Labs Inc.
3000 Bristol Circle
Oakville Ontario, L6H 6G4
Canada
Date of Grant: 09/16/2015

Application Dated: 09/16/2015
Unique Broadband Systems Ltd.
400 Spinnaker Way
Vaughan, L4K 5Y9
Canada
 
Attention: Catalin Popescu , Project Manager, Systems Engineer

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  2ACLT-DRU2KW
Name of Grantee:  Unique Broadband Systems Ltd.
Equipment Class: Licensed Non-Broadcast Station Transmitter
Notes: 2KW Satellite Dual Repeater Unit
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
68 25 2326.25  -  2326.25 1740.0 8.000E-7  % 3M81W1W
68 25 2326.25604  -  2326.25604 2.75 8.000E-7  % 20K8W1W
68 25 2338.755  -  2338.755 1740.0 3.000E-7  % 4M98W1W

Power output is RF conducted. Final antenna installation and operating configurations of this transmitter including antenna gain and cable loss must not exceed the EIRP requirements of 25.214(d). The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. Site-by-site basis requires RF exposure compliance be addressed at the time of licensing, as required by the responsible FCC bureau(s), including antenna co-location requirements of §1.1307 (b)(3). Blanket license operation of SDARS terrestrial repeaters requires operators to maintain demonstration of compliance with Part 1, Subpart I, of this chapter and make such demonstrations available to the commission upon request within three business days.

68: This grant does not pertain to equipment approval requirements under Part 68.

EAS Grant - Application I7o/6lxvR61onBJrWwMYCw==

COPY FEDERAL COMMUNICATIONS
COMMISSION
WASHINGTON, D.C. 20554

GRANT OF EQUIPMENT
AUTHORIZATION
COPY
Certification

Unique Broadband Systems Ltd.
400 Spinnaker Way
Vaughan, L4K 5Y9
Canada
  Date of Grant: 09/16/2015

Application Dated: 09/16/2015
 
Attention: Catalin Popescu , Project Manager, Systems Engineer

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  2ACLT-DRU2KW
Name of Grantee:  Unique Broadband Systems Ltd.
Equipment Class: Licensed Non-Broadcast Station Transmitter
Notes: 2KW Satellite Dual Repeater Unit
Modular Type: Does not apply
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
68 25 2326.25  -  2326.25 1740.0 8.000E-7  % 3M81W1W
68 25 2326.25604  -  2326.25604 2.75 8.000E-7  % 20K8W1W
68 25 2338.755  -  2338.755 1740.0 3.000E-7  % 4M98W1W

Power output is RF conducted. Final antenna installation and operating configurations of this transmitter including antenna gain and cable loss must not exceed the EIRP requirements of 25.214(d). The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. Site-by-site basis requires RF exposure compliance be addressed at the time of licensing, as required by the responsible FCC bureau(s), including antenna co-location requirements of §1.1307 (b)(3). Blanket license operation of SDARS terrestrial repeaters requires operators to maintain demonstration of compliance with Part 1, Subpart I, of this chapter and make such demonstrations available to the commission upon request within three business days.


68: This grant does not pertain to equipment approval requirements under Part 68.

Mail To: