FCC ID A3LRFV01U-D1A

RRU (RFV01U)

by Samsung Electronics Co Ltd

Grantee Code: A3L   Product Code: RFV01UD1A
Latest application date: 2025-12-02

FCC ID Device Details

FCC IDA3LRFV01U-D1A
Mirrorsfcc.id | gov | fccid.ai
Grantee CodeA3L
Product CodeRFV01UD1A
Applicant BusinessSamsung Electronics Co Ltd 🇺🇸
Related Domains samsung.com
Equipment ClassRRU (RFV01U)
Test FirmCTK Co., Ltd.

Operating Frequencies

Frequency RangeApplication PurposeFinal Action Date
2110-2180 MHzClass II permissive change or modification of presently authorized equipment2025-12-02
1930-1990 MHzClass II permissive change or modification of presently authorized equipment2022-07-11
1930-1990 MHzClass II permissive change or modification of presently authorized equipment2021-08-26
1930-1990 MHzClass II permissive change or modification of presently authorized equipment2021-06-25
1930-1990 MHzClass II permissive change or modification of presently authorized equipment2021-01-28
1930-1990 MHzClass II permissive change or modification of presently authorized equipment2017-09-12
1930-1990 MHzOriginal Equipment2017-09-06

Exhibits

DocumentTypeAvailableFile
User Manual-1Users Manual2018-03-05PDF 3.8 MB
User Manual-2Users Manual2018-03-05PDF 3.4 MB
Request manual and internal photo to Long term LetterCover Letter(s)2017-09-06PDF 504.8 KB
Internal PhotosInternal Photos2018-03-05PDF 522.7 KB
External PhotosExternal Photos2018-03-05PDF 393.9 KB
Label Location PhotoID Label/Location Info2017-09-06PDF 92.5 KB
Test Setup PhotographsTest Setup Photos2026-05-31PDF 975.2 KB
Test Setup PhotographsTest Setup Photos2023-01-07PDF 484.2 KB
Test Setup Photos_20210722_v1 - RFV01U-D1A Annex B_EUT and Test Setup PhotoTest Setup Photos2022-02-06PDF 1.2 MB
Test Setup PhotographsTest Setup Photos2021-12-22PDF 562.9 KB
Test Setup PhotosTest Setup Photos2018-03-05PDF 280.8 KB
Test Report 1Test Report2025-12-02PDF 4.3 MB
Test Report 2Test Report2025-12-02PDF 3.7 MB
Test Report 3Test Report2025-12-02PDF 5.1 MB
Test Report 4Test Report2025-12-02PDF 5.3 MB
Test Report 5Test Report2025-12-02PDF 3.6 MB
Test Report 1Test Report2022-07-11PDF 3.9 MB
Test Report 10Test Report2022-07-11PDF 2.2 MB
Test Report 2Test Report2022-07-11PDF 2.7 MB
Test Report 3Test Report2022-07-11PDF 5 MB
Test Report 4Test Report2022-07-11PDF 5.4 MB
Test Report 5Test Report2022-07-11PDF 4.1 MB
Test Report 6Test Report2022-07-11PDF 3.7 MB
Test Report 7Test Report2022-07-11PDF 3.9 MB
Test Report 8Test Report2022-07-11PDF 3.8 MB
Test Report 9Test Report2022-07-11PDF 5.4 MB
A3LRFV01U-D1A FCC Test Report_Rev01_Part1 Metadata onlyTest Report2021-08-26PDF 5.5 MB
A3LRFV01U-D1A FCC Test Report_Rev01_Part2 Metadata onlyTest Report2021-08-26PDF 5.4 MB
A3LRFV01U-D1A FCC Test Report_Rev01_Part3 Metadata onlyTest Report2021-08-26PDF 5.4 MB
A3LRFV01U-D1A FCC Test Report_Rev01_Part4 Metadata onlyTest Report2021-08-26PDF 1.6 MB
A3LRFV01U-D1A FCC Test Report_Rev02_Part1Test Report2021-08-26PDF 5.4 MB
A3LRFV01U-D1A FCC Test Report_Rev02_Part2Test Report2021-08-26PDF 5.5 MB
A3LRFV01U-D1A FCC Test Report_Rev02_Part3Test Report2021-08-26PDF 5.5 MB
A3LRFV01U-D1A FCC Test Report_Rev02_Part4Test Report2021-08-26PDF 5.5 MB
A3LRFV01U-D1A FCC Test Report_Rev02_Part5Test Report2021-08-26PDF 2 MB
Test Report 1Test Report2021-06-25PDF 5.1 MB
Test Report 2Test Report2021-06-25PDF 5.3 MB
Test Report 3Test Report2021-06-25PDF 5.2 MB
Test Report 4Test Report2021-06-25PDF 5.2 MB
Test Report 5Test Report2021-06-25PDF 5 MB
Test Report 6Test Report2021-06-25PDF 5 MB
Test Report 7Test Report2021-06-25PDF 4.9 MB
Test Report 8Test Report2021-06-25PDF 3.7 MB
Test Report 1Test Report2021-01-28PDF 5.8 MB
Test Report 10Test Report2021-01-28PDF 4.9 MB
Test Report 11Test Report2021-01-28PDF 5 MB
Test Report 12Test Report2021-01-28PDF 4.8 MB
Test Report 2Test Report2021-01-28PDF 3.9 MB
Test Report 3Test Report2021-01-28PDF 3.9 MB
Test Report 4Test Report2021-01-28PDF 3.5 MB
Test Report 5Test Report2021-01-28PDF 4.1 MB
Test Report 6Test Report2021-01-28PDF 4.2 MB
Test Report 7Test Report2021-01-28PDF 4.4 MB
Test Report 8Test Report2021-01-28PDF 5 MB
Test Report 9Test Report2021-01-28PDF 5.1 MB
Test Report Band 2-1Test Report2017-09-12PDF 4.8 MB
Test Report Band 2-2Test Report2017-09-12PDF 4.8 MB
Test Report Band 2-3Test Report2017-09-12PDF 4.8 MB
Test Report Band 2-4Test Report2017-09-12PDF 1.7 MB
Test Report Band 66-1Test Report2017-09-12PDF 5.5 MB
Test Report Band 66-2Test Report2017-09-12PDF 5.5 MB
Test Report Band 66-3Test Report2017-09-12PDF 5.3 MB
Test Report Band 66-4Test Report2017-09-12PDF 5.2 MB
Test Report Band 66-5Test Report2017-09-12PDF 5.7 MB
Test Report Band 66-6Test Report2017-09-12PDF 5.3 MB
Test Report Band 66-7Test Report2017-09-12PDF 5.7 MB
Test Report Band 66-8Test Report2017-09-12PDF 3.5 MB
Test Report Band 66-9Test Report2017-09-12PDF 4.9 MB
Test Report -1Test Report2017-09-06PDF 5.2 MB
Test Report -2Test Report2017-09-06PDF 3.6 MB
Test Report -3Test Report2017-09-06PDF 4.9 MB
Test Report -4Test Report2017-09-06PDF 5.8 MB
Test Report -5Test Report2017-09-06PDF 5.8 MB
Test Report -6Test Report2017-09-06PDF 5.7 MB
Test Report -7Test Report2017-09-06PDF 3.2 MB
Authorization LetterAttestation Statements2025-12-02PDF 163.4 KB
FCC 2.911 (d)(5) Covered List AttestationAttestation Statements2025-12-02PDF 148.3 KB
FCC 2.911 (d)(7) Agent for Service AttestationAttestation Statements2025-12-02PDF 209.3 KB
Lab Authorization LetterAttestation Statements2025-12-02PDF 195.7 KB
Authorization LetterAttestation Statements2022-07-11PDF 334.4 KB
TCB Authorization LetterAttestation Statements2022-07-11PDF 369.8 KB
Authorization LetterAttestation Statements2021-06-25PDF 136.3 KB
TCB Authorization LetterAttestation Statements2021-06-25PDF 167.1 KB
Class II Cover LetterCover Letter(s)2025-12-02PDF 165.2 KB
Confidentiality Request LetterCover Letter(s)2025-12-02PDF 191.2 KB
Class II Cover LetterCover Letter(s)2022-07-11PDF 166 KB
Confidentiality Request Letter 1Cover Letter(s)2022-07-11PDF 376 KB
Confidentiality Request Letter 2Cover Letter(s)2022-07-11PDF 349.2 KB
A3LRFV01U-D1A_C2PC Letter_Rev.01Cover Letter(s)2021-08-26PDF 542.3 KB
Cover Letters_20210722_v1 - A3LRFV01U-D1A_Authorization LetterCover Letter(s)2021-08-26PDF 401.3 KB
Cover Letters_20210722_v1 - A3LRFV01U-D1A_Authorization Letter_Jenni ChunCover Letter(s)2021-08-26PDF 274.5 KB
Cover Letters_20210722_v1 - A3LRFV01U-D1A_Confidentiality Request letterCover Letter(s)2021-08-26PDF 340 KB
Class II Cover LetterCover Letter(s)2021-06-25PDF 161.6 KB
Confidentiality Request LetterCover Letter(s)2021-06-25PDF 142.7 KB
Authorization LetterCover Letter(s)2021-01-28PDF 90.5 KB
C2PC Cover LetterCover Letter(s)2021-01-28PDF 93.1 KB
POA LetterCover Letter(s)2021-01-28PDF 73.9 KB
Authorization LetterCover Letter(s)2017-09-12PDF 322.7 KB
C2PC LetterCover Letter(s)2017-09-12PDF 49.9 KB
POACover Letter(s)2017-09-12PDF 43.9 KB
Confidentiality LetterCover Letter(s)2017-09-06PDF 94.8 KB
RF Exposure InfoRF Exposure Info2025-12-02PDF 146.5 KB
RF ExposureRF Exposure Info2017-09-06PDF 168.4 KB
Users Manual Metadata onlyUsers ManualPDF 4.2 MB
Block Diagram Metadata onlyBlock DiagramPDF 323 KB
Schematics Metadata onlySchematicsPDF 3.9 MB
A3LRFV01U-D1A_Operational Description_Rev.01 Metadata onlyOperational DescriptionPDF 553.6 KB
A3LRFV01U-D1A_Operational Description_Rev.02 Metadata onlyOperational DescriptionPDF 553.8 KB
NR NDA Metadata onlyOperational DescriptionPDF 606.3 KB
Operational Description Metadata onlyOperational DescriptionPDF 335.3 KB
Operational Description Metadata onlyOperational DescriptionPDF 386.7 KB
Operational Description Metadata onlyOperational DescriptionPDF 235.4 KB
Operational Description Metadata onlyOperational DescriptionPDF 100.1 KB
Operational Description_20210722_v1 - KDB Inquiry response Metadata onlyOperational DescriptionPDF 164.2 KB
Operational Description_20210722_v1 - KDB Inquiry response_Tracking Number 23665 Metadata onlyOperational DescriptionPDF 164.2 KB
Parts List Metadata onlyParts List/Tune Up InfoPDF 325.3 KB
Tune Up Procedure Metadata onlyParts List/Tune Up InfoPDF 70.7 KB

Application Information

Application IDdDJK+YSE2y1o0AGleS8Ibw==
Final Action Date2025-12-02
Application PurposeClass II permissive change or modification of presently authorized equipment
Applicant FRN0027908797
ModelRFV01U-D1A
Frequency Range2110-2180 MHz
Equipment ClassPCB - PCS Licensed Transmitter
Device DescriptionRRU (RFV01U)
Responsible PartyJenni Chun, j1.chun@samsung.com , 973-808-6375
Technical ContactJongin Kim, Samsung Electronics Co. Ltd, jered.kim@samsung.com
Test FirmYoung-Joon Park, CTK Co., Ltd., YoungJoon.Park@element.com , 82-31-8020-0620
TCB Emailtcb@element.com
TCB ScopeB1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
Short-Term ConfidentialityYes
Long-Term ConfidentialityYes
Modular EquipmentDoes not apply
Composite DeviceNo
Cognitive RadioNo
Authorization WaiverNo
Authorization Waiver ApprovedNo
Section 5301 CertificationYes
Related OET Knowledge DataBase InquiryNo

Applications

Application IDDatePurpose
dDJK+YSE2y1o0AGleS8Ibw==2025-12-02Class II permissive change or modification of presently authorized equipment
cmeQuwUGRAVZhpLezERdxg==2022-07-11Class II permissive change or modification of presently authorized equipment
9KgtahkPOVmvGnwcR4W7Dg==2021-08-26Class II permissive change or modification of presently authorized equipment
mw2u9rcQ+jh7kKW95grV/A==2021-06-25Class II permissive change or modification of presently authorized equipment
HXRjb9WUkKoQBZGwcDLPcA==2021-01-28Class II permissive change or modification of presently authorized equipment
2pTjse5j8XXb6xlG9emgDQ==2017-09-12Class II permissive change or modification of presently authorized equipment
HHAsdCHSpdkn9E1l17JvOg==2017-09-06Original Equipment

Equipment Authorization

FrequencyOutputToleranceEmissionRulesGrant Notes
1930-1990 MHz177.250.38ppm19M1G7D24EMO
1930-1990 MHz177.930.38ppm19M1W7D24EMO
1930-1990 MHz161.440.38ppm24M2G7D24EMO
1930-1990 MHz161.840.38ppm24M2W7D24EMO
1930-1990 MHz156.70.38ppm18M8W7D24EMO
1930-1990 MHz164.40.38ppm18M8G7D24EMO
1930-1990 MHz169.370.38ppm23M7G7D24EMO
1930-1990 MHz175.630.38ppm23M7W7D24EMO
2110-2180 MHz205.60.42ppm29M0G7D27MO
2110-2180 MHz259.420.42ppm33M6W7D27MO
2110-2180 MHz241.50.42ppm18M8G7D27MO
2110-2180 MHz242.370.42ppm28M5G7D27MO
2110-2180 MHz244.690.42ppm28M6W7D27MO
2110-2180 MHz235.790.42ppm34M2G7D27MO
2110-2180 MHz240.330.42ppm34M0W7D27MO
2110-2180 MHz238.80.42ppm29M0W7D27MO
2110-2180 MHz250.60.42ppm18M8W7D27MO
2110-2180 MHz261.270.42ppm33M6G7D27MO

Grants

TCB Grant - Application mw2u9rcQ+jh7kKW95grV/A==

TCB GRANT OF EQUIPMENT
AUTHORIZATION
TCB
Certification
Issued Under the Authority of the
Federal Communications Commission
By:

  PCTEST Engineering Laboratory, LLC
7185 Oakland Mills Road
Columbia, MD 21046
Date of Grant: 06/25/2021

Application Dated: 06/25/2021
Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 24E 1930.0  -  1990.0 169.37 0.38  PM 23M7G7D
MO 24E 1930.0  -  1990.0 175.63 0.38  PM 23M7W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 27 2110.0  -  2180.0 261.27 0.42  PM 33M6G7D
MO 27 2110.0  -  2180.0 259.42 0.42  PM 33M6W7D

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3). Class II Permissive Change to add 2-carrier (20+5 MHz) in LTE Band 2 and 3-carrier (15+10+10 MHz and 20+5+10 MHz) in LTE Band 66.

MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

EAS Grant - Application mw2u9rcQ+jh7kKW95grV/A==

COPY FEDERAL COMMUNICATIONS
COMMISSION
WASHINGTON, D.C. 20554

GRANT OF EQUIPMENT
AUTHORIZATION
COPY
Certification

Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
United States
  Date of Grant: 06/25/2021

Application Dated: 06/25/2021
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Modular Type: Does not apply
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 24E 1930.0  -  1990.0 169.37 0.38  PM 23M7G7D
MO 24E 1930.0  -  1990.0 175.63 0.38  PM 23M7W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 27 2110.0  -  2180.0 261.27 0.42  PM 33M6G7D
MO 27 2110.0  -  2180.0 259.42 0.42  PM 33M6W7D

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3). Class II Permissive Change to add 2-carrier (20+5 MHz) in LTE Band 2 and 3-carrier (15+10+10 MHz and 20+5+10 MHz) in LTE Band 66.


MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

TCB Grant - Application HXRjb9WUkKoQBZGwcDLPcA==

Mail To:
TCB GRANT OF EQUIPMENT
AUTHORIZATION
TCB
Certification
Issued Under the Authority of the
Federal Communications Commission
By:

  Timco Engineering, Inc.
849 NW State Road 45
Newberry, FL 32669
Date of Grant: 01/28/2021

Application Dated: 01/28/2021
Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3). Class II Permissive Change to add 2-carrier(15+15 MHz), 3-carrier(20+5+5 MHz/15+5+5 MHz) in LTE Band 66.

MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

EAS Grant - Application HXRjb9WUkKoQBZGwcDLPcA==

COPY FEDERAL COMMUNICATIONS
COMMISSION
WASHINGTON, D.C. 20554

GRANT OF EQUIPMENT
AUTHORIZATION
COPY
Certification

Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
United States
  Date of Grant: 01/28/2021

Application Dated: 01/28/2021
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Modular Type: Does not apply
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3). Class II Permissive Change to add 2-carrier(15+15 MHz), 3-carrier(20+5+5 MHz/15+5+5 MHz) in LTE Band 66.


MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

TCB Grant - Application HHAsdCHSpdkn9E1l17JvOg==

Mail To:
TCB GRANT OF EQUIPMENT
AUTHORIZATION
TCB
Certification
Issued Under the Authority of the
Federal Communications Commission
By:

  Timco Engineering, Inc.
849 NW State Road 45
Newberry, FL 32669
Date of Grant: 09/06/2017

Application Dated: 09/06/2017
Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).

MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

EAS Grant - Application HHAsdCHSpdkn9E1l17JvOg==

COPY FEDERAL COMMUNICATIONS
COMMISSION
WASHINGTON, D.C. 20554

GRANT OF EQUIPMENT
AUTHORIZATION
COPY
Certification

Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
United States
  Date of Grant: 09/06/2017

Application Dated: 09/06/2017
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Modular Type: Does not apply
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).


MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

TCB Grant - Application dDJK+YSE2y1o0AGleS8Ibw==

Mail To:
TCB GRANT OF EQUIPMENT
AUTHORIZATION
TCB
Certification
Issued Under the Authority of the
Federal Communications Commission
By:

  Element Materials Technology Washington DC LLC
(formerly PCTEST) 7185 Oakland Mills Road
Columbia, MD 21046
Date of Grant: 12/02/2025

Application Dated: 12/01/2025
Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 24E 1930.0  -  1990.0 169.37 0.38  PM 23M7G7D
MO 24E 1930.0  -  1990.0 175.63 0.38  PM 23M7W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 27 2110.0  -  2180.0 261.27 0.42  PM 33M6G7D
MO 27 2110.0  -  2180.0 259.42 0.42  PM 33M6W7D
MO 24E 1930.0  -  1990.0 177.25 0.38  PM 19M1G7D
MO 24E 1930.0  -  1990.0 177.93 0.38  PM 19M1W7D
MO 27 2110.0  -  2180.0 242.37 0.42  PM 28M5G7D
MO 27 2110.0  -  2180.0 244.69 0.42  PM 28M6W7D
MO 24E 1930.0  -  1990.0 161.44 0.38  PM 24M2G7D
MO 24E 1930.0  -  1990.0 161.84 0.38  PM 24M2W7D
MO 27 2110.0  -  2180.0 235.79 0.42  PM 34M2G7D
MO 27 2110.0  -  2180.0 240.33 0.42  PM 34M0W7D
MO 24E 1930.0  -  1990.0 182.12 0.38  PM 24M0G7D
MO 24E 1930.0  -  1990.0 180.76 0.38  PM 24M0W7D
MO 24E 1930.0  -  1990.0 122.49 0.38  PM 24M0G7D
MO 24E 1930.0  -  1990.0 122.05 0.38  PM 24M0W7D
MO 27 2110.0  -  2180.0 265.7 0.42  PM 24M0G7D
MO 27 2110.0  -  2180.0 265.12 0.42  PM 24M0W7D
MO 27 2110.0  -  2180.0 265.24 0.42  PM 28M9G7D
MO 27 2110.0  -  2180.0 265.12 0.42  PM 28M9W7D
MO 27 2110.0  -  2180.0 227.71 0.42  PM 29M3G7D
MO 27 2110.0  -  2180.0 231.73 0.42  PM 29M7W7D
MO 27 2110.0  -  2180.0 239.05 0.42  PM 34M4G7D
MO 27 2110.0  -  2180.0 240.07 0.42  PM 34M4W7D
MO 27 2110.0  -  2180.0 229.5 0.42  PM 29M3G7D
MO 27 2110.0  -  2180.0 229.2 0.42  PM 29M3W7D
MO 27 2110.0  -  2180.0 227.32 0.42  PM 34M6G7D
MO 27 2110.0  -  2180.0 227.47 0.42  PM 34M6W7D
MO 27 2110.0  -  2180.0 221.18 0.42  PM 34M2G7D
MO 27 2110.0  -  2180.0 218.76 0.42  PM 34M2W7D
MO 27 2110.0  -  2180.0 166.17 0.42  PM 24M0G7D
MO 27 2110.0  -  2180.0 166.36 0.42  PM 24M0W7D
MO 27 2110.0  -  2180.0 160.34 0.42  PM 28M9G7D
MO 27 2110.0  -  2180.0 159.42 0.42  PM 28M9W7D
MO 27 2110.0  -  2180.0 161.64 0.42  PM 29M3G7D
MO 27 2110.0  -  2180.0 158.14 0.42  PM 29M3W7D
MO 27 2110.0  -  2180.0 163.7 0.42  PM 34M4G7D
MO 27 2110.0  -  2180.0 163.54 0.42  PM 34M4W7D
MO 27 2110.0  -  2180.0 162.02 0.42  PM 29M3G7D
MO 27 2110.0  -  2180.0 161.84 0.42  PM 29M3W7D
MO 27 2110.0  -  2180.0 157.81 0.42  PM 34M6G7D
MO 27 2110.0  -  2180.0 156.4 0.42  PM 34M6W7D
MO 27 2110.0  -  2180.0 150.67 0.42  PM 34M2G7D
MO 27 2110.0  -  2180.0 151.04 0.42  PM 34M2W7D

Power listed is maximum conducted output power. 240W per band: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The NR and LTE bands 2 and 66 were tested for QPSK, 16QAM, 64QAM, and 256QAM. Class 2 Permissive Change to add 25 MHz BW for n2 and 25 MHz and 30 MHz for n66. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).

MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

TCB Grant - Application cmeQuwUGRAVZhpLezERdxg==

TCB GRANT OF EQUIPMENT
AUTHORIZATION
TCB
Certification
Issued Under the Authority of the
Federal Communications Commission
By:

  Element Materials Technology Washington DC LLC
(formerly PCTEST) 7185 Oakland Mills Road
Columbia, MD 21046
Date of Grant: 07/11/2022

Application Dated: 07/11/2022
Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU(RFV01U)
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 24E 1930.0  -  1990.0 169.37 0.38  PM 23M7G7D
MO 24E 1930.0  -  1990.0 175.63 0.38  PM 23M7W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 27 2110.0  -  2180.0 261.27 0.42  PM 33M6G7D
MO 27 2110.0  -  2180.0 259.42 0.42  PM 33M6W7D
MO 24E 1930.0  -  1990.0 177.25 0.38  PM 19M1G7D
MO 24E 1930.0  -  1990.0 177.93 0.38  PM 19M1W7D
MO 27 2110.0  -  2180.0 242.37 0.42  PM 28M5G7D
MO 27 2110.0  -  2180.0 244.69 0.42  PM 28M6W7D
MO 24E 1930.0  -  1990.0 161.44 0.38  PM 24M2G7D
MO 24E 1930.0  -  1990.0 161.84 0.38  PM 24M2W7D
MO 27 2110.0  -  2180.0 235.79 0.42  PM 34M2G7D
MO 27 2110.0  -  2180.0 240.33 0.42  PM 34M0W7D

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).

Class II Permissive Change to add 5G NR single carrier (5,10,15,20 MHz), DSS single carrier (15,20 MHz), and 5G NR & DSS 2-carrier (up to 25 MHz) in LTE Band 2, and 5G NR single carrier (5,10,15,20 MHz), DSS single carrier (15,20 MHz) and 5G NR & DSS 3-carrier (up to 35 MHz) in LTE Band 66.


MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

EAS Grant - Application cmeQuwUGRAVZhpLezERdxg==

COPY FEDERAL COMMUNICATIONS
COMMISSION
WASHINGTON, D.C. 20554

GRANT OF EQUIPMENT
AUTHORIZATION
COPY
Certification

Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
United States
  Date of Grant: 07/11/2022

Application Dated: 07/11/2022
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU(RFV01U)
Modular Type: Does not apply
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 24E 1930.0  -  1990.0 169.37 0.38  PM 23M7G7D
MO 24E 1930.0  -  1990.0 175.63 0.38  PM 23M7W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 27 2110.0  -  2180.0 261.27 0.42  PM 33M6G7D
MO 27 2110.0  -  2180.0 259.42 0.42  PM 33M6W7D
MO 24E 1930.0  -  1990.0 177.25 0.38  PM 19M1G7D
MO 24E 1930.0  -  1990.0 177.93 0.38  PM 19M1W7D
MO 27 2110.0  -  2180.0 242.37 0.42  PM 28M5G7D
MO 27 2110.0  -  2180.0 244.69 0.42  PM 28M6W7D
MO 24E 1930.0  -  1990.0 161.44 0.38  PM 24M2G7D
MO 24E 1930.0  -  1990.0 161.84 0.38  PM 24M2W7D
MO 27 2110.0  -  2180.0 235.79 0.42  PM 34M2G7D
MO 27 2110.0  -  2180.0 240.33 0.42  PM 34M0W7D

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).

Class II Permissive Change to add 5G NR single carrier (5,10,15,20 MHz), DSS single carrier (15,20 MHz), and 5G NR & DSS 2-carrier (up to 25 MHz) in LTE Band 2, and 5G NR single carrier (5,10,15,20 MHz), DSS single carrier (15,20 MHz) and 5G NR & DSS 3-carrier (up to 35 MHz) in LTE Band 66.


MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

TCB Grant - Application 9KgtahkPOVmvGnwcR4W7Dg==

Mail To:
TCB GRANT OF EQUIPMENT
AUTHORIZATION
TCB
Certification
Issued Under the Authority of the
Federal Communications Commission
By:

  UL Verification Services Inc. (formerly UL CCS)
47173 Benicia Street
Fremont, CA 94538
Date of Grant: 08/26/2021

Application Dated: 08/10/2021
Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 24E 1930.0  -  1990.0 169.37 0.38  PM 23M7G7D
MO 24E 1930.0  -  1990.0 175.63 0.38  PM 23M7W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 27 2110.0  -  2180.0 261.27 0.42  PM 33M6G7D
MO 27 2110.0  -  2180.0 259.42 0.42  PM 33M6W7D
MO 24E 1930.0  -  1990.0 177.25 0.38  PM 19M1G7D
MO 24E 1930.0  -  1990.0 177.93 0.38  PM 19M1W7D
MO 27 2110.0  -  2180.0 242.37 0.42  PM 28M5G7D
MO 27 2110.0  -  2180.0 244.69 0.42  PM 28M6W7D

Class II Permissive Change to add 10MHz DSS(Dynamic Spectrum Sharing) operation mode for LTE and NR transmitters.

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).


MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

EAS Grant - Application 9KgtahkPOVmvGnwcR4W7Dg==

COPY FEDERAL COMMUNICATIONS
COMMISSION
WASHINGTON, D.C. 20554

GRANT OF EQUIPMENT
AUTHORIZATION
COPY
Certification

Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
United States
  Date of Grant: 08/26/2021

Application Dated: 08/10/2021
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Modular Type: Does not apply
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 24E 1930.0  -  1990.0 169.37 0.38  PM 23M7G7D
MO 24E 1930.0  -  1990.0 175.63 0.38  PM 23M7W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 27 2110.0  -  2180.0 261.27 0.42  PM 33M6G7D
MO 27 2110.0  -  2180.0 259.42 0.42  PM 33M6W7D
MO 24E 1930.0  -  1990.0 177.25 0.38  PM 19M1G7D
MO 24E 1930.0  -  1990.0 177.93 0.38  PM 19M1W7D
MO 27 2110.0  -  2180.0 242.37 0.42  PM 28M5G7D
MO 27 2110.0  -  2180.0 244.69 0.42  PM 28M6W7D

Class II Permissive Change to add 10MHz DSS(Dynamic Spectrum Sharing) operation mode for LTE and NR transmitters.

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).


MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

TCB Grant - Application 2pTjse5j8XXb6xlG9emgDQ==

Mail To:
TCB GRANT OF EQUIPMENT
AUTHORIZATION
TCB
Certification
Issued Under the Authority of the
Federal Communications Commission
By:

  Timco Engineering, Inc.
849 NW State Road 45
Newberry, FL 32669
Date of Grant: 09/12/2017

Application Dated: 09/12/2017
Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).

MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

EAS Grant - Application 2pTjse5j8XXb6xlG9emgDQ==

COPY FEDERAL COMMUNICATIONS
COMMISSION
WASHINGTON, D.C. 20554

GRANT OF EQUIPMENT
AUTHORIZATION
COPY
Certification

Samsung Electronics Co Ltd
19 Chapin Rd., Building D
Pine Brook, NJ 07058
United States
  Date of Grant: 09/12/2017

Application Dated: 09/12/2017
 
Attention: Jenni Chun , General Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  A3LRFV01U-D1A
Name of Grantee:  Samsung Electronics Co Ltd
Equipment Class: PCS Licensed Transmitter
Notes: RRU (RFV01U)
Modular Type: Does not apply
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
MO 27 2110.0  -  2180.0 205.6 0.42  PM 29M0G7D
MO 27 2110.0  -  2180.0 238.8 0.42  PM 29M0W7D
MO 24E 1930.0  -  1990.0 164.4 0.38  PM 18M8G7D
MO 24E 1930.0  -  1990.0 156.7 0.38  PM 18M8W7D
MO 27 2110.0  -  2180.0 241.5 0.42  PM 18M8G7D
MO 27 2110.0  -  2180.0 250.6 0.42  PM 18M8W7D

Power listed is maximum conducted output power. 240W per unit: 4x60W or 4x40W or 2x90W or 2x60W or 2x40W. The LTE band 2 and 66 was tested for QPSK, 16QAM, 64QAM, and 256QAM. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).


MO: This Multiple Input Multiple Output (MIMO) device was evaluated for multiple transmitted signals as indicated in the filing.

Mail To: