FCC ID PKTNODEBDZ
Wireless Broadband Base Station
by General Dynamics Broadband, Inc.
Grantee Code: PKT Product Code: NODEBDZ
Latest application date: 2004-04-20
FCC ID Device Details
| FCC ID | PKTNODEBDZ |
|---|---|
| Mirrors | fcc.id | gov | fccid.ai |
| Grantee Code | PKT |
| Product Code | NODEBDZ |
| Applicant Business | General Dynamics Broadband, Inc. 🇺🇸 |
| Related Domains | |
| Equipment Class | Wireless Broadband Base Station |
| Test Firm | RFI Global Services Ltd. |
Operating Frequencies
| Frequency Range | Application Purpose | Final Action Date |
|---|---|---|
| 2503-2683 MHz | Original Equipment | 2004-04-20 |
Exhibits
| Document | Type | Available | File |
|---|---|---|---|
| Users Manual Part 1 | Users Manual | 2004-04-20 | PDF 1.7 MB |
| Users manual Part 2 | Users Manual | 2004-04-20 | PDF 1.9 MB |
| Internal photos | Internal Photos | 2004-04-20 | PDF 1.1 MB |
| External photos | External Photos | 2004-04-20 | PDF 251.2 KB |
| Label | ID Label/Location Info | 2004-04-20 | PDF 60.5 KB |
| Block diagram | Block Diagram | 2004-04-20 | PDF 25.5 KB |
| Test Set Ups | Test Setup Photos | 2004-04-20 | PDF 117.8 KB |
| Test report | Test Report | 2004-04-20 | PDF 1.8 MB |
| Confidentiality letter | Cover Letter(s) | 2004-04-20 | PDF 46.6 KB |
| Tune up letter | Parts List/Tune Up Info | 2004-04-20 | PDF 38.8 KB |
| Radio Metadata only | Schematics | PDF 35.8 KB | |
| Transmitter Metadata only | Schematics | PDF 601 KB | |
| Operational description Metadata only | Operational Description | PDF 1.4 MB | |
| Parts List 1 Metadata only | Parts List/Tune Up Info | PDF 85.2 KB | |
| Parts List 2 Metadata only | Parts List/Tune Up Info | PDF 36.6 KB |
Application Information
| Application ID | i/bDN2/HxIFQ4qFgDfgGKQ== |
|---|---|
| Final Action Date | 2004-04-20 |
| Application Purpose | Original Equipment |
| Applicant FRN | 0005883095 |
| Model | NODEBDZ |
| Frequency Range | 2503-2683 MHz |
| Equipment Class | TNB - Licensed Non-Broadcast Station Transmitter |
| Device Description | Wireless Broadband Base Station |
| Responsible Party | Joseph Cheung, jcheung@ipwireless.com |
| Technical Contact | Peter Warburg, IPWireless (UK) Ltd, pwarburg@ipwireless.com |
| Test Firm | Allan Hume, RFI Global Services Ltd., alan.hume@rfi-global.com |
| TCB Email | nick.cobb@rfi-wireless.com |
| TCB Scope | B4: Microwave, Millimeter Wave Band and Citizens Broadband Radio Services equipment in 47 CFR Parts 25, 30, 74, 90, 95, 96, 97, 101 (all above 3 GHz) |
| Short-Term Confidentiality | No |
| Long-Term Confidentiality | Yes |
| Grant Deferral | No |
| Modular Equipment | Does not apply |
| Composite Device | No |
| Composite Part | No |
| Cognitive Radio | No |
| Authorization Waiver | No |
| Authorization Waiver Approved | No |
| Section 5301 Certification | Yes |
| Related OET Knowledge DataBase Inquiry | No |
| Grant Comments | The antenna(s) used for this transmitter are to be fixed-mounted on outdoor permanent structures with a separation distance of at least 6 meters from all persons during normal operation.The peak conducted output power at each antenna terminal must not exceed 9.33W and the peak radiated output power must not exceed 933.25W EIRP. Users and installers must be provided with appropriate antenna installation instructions and transmitter operating conditions, including antenna co-location requirements of Part1.1307(b)(3), for satisfying RF exposure compliance. |
Applications
| Application ID | Date | Purpose |
|---|---|---|
| i/bDN2/HxIFQ4qFgDfgGKQ== | 2004-04-20 | Original Equipment |
Equipment Authorization
Grants
TCB Grant - Application i/bDN2/HxIFQ4qFgDfgGKQ==
| TCB | GRANT OF EQUIPMENT AUTHORIZATION |
TCB |
| Certification | ||
| Issued Under the Authority of the | ||
| Federal Communications Commission | ||
| By: |
|
UL International (UK) Ltd Unit 1 - 3 Horizon Kingsland Business Park Wade Road Basingstoke, RG24 8AH United Kingdom |
Date of Grant: 04/20/2004 Application Dated: 04/20/2004 |
| General Dynamics Broadband, Inc. |
| 90 New Montgomery Street |
| Suite 315 |
| San Francisco, CA 94105 |
| Attention: Joseph Cheung |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | PKTNODEBDZ |
| Name of Grantee: | General Dynamics Broadband, Inc. |
| Equipment Class: | Licensed Non-Broadcast Station Transmitter |
| Notes: | Wireless Broadband Base Station |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| 21 | 2503.0 - 2683.0 | 9.33 | 0.01 % | 4M2G7D | |
| 74 | 2503.0 - 2683.0 | 9.33 | 0.01 % | 4M2G7D | |
| 21 | 2506.0 - 2680.0 | 4.79 | 0.01 % | 8M2G7D | |
| 74 | 2506.0 - 2680.0 | 4.79 | 0.01 % | 8M2G7D |
| The antenna(s) used for this transmitter are to be fixed-mounted on outdoor permanent structures with a separation distance of at least 6 meters from all persons during normal operation.The peak conducted output power at each antenna terminal must not exceed 9.33W and the peak radiated output power must not exceed 933.25W EIRP. Users and installers must be provided with appropriate antenna installation instructions and transmitter operating conditions, including antenna co-location requirements of Part1.1307(b)(3), for satisfying RF exposure compliance. |
EAS Grant - Application i/bDN2/HxIFQ4qFgDfgGKQ==
| COPY |
FEDERAL COMMUNICATIONS COMMISSION WASHINGTON, D.C. 20554 GRANT OF EQUIPMENT AUTHORIZATION |
COPY |
| Certification |
|
General Dynamics Broadband, Inc. 90 New Montgomery Street Suite 315 San Francisco, CA 94105 United States |
Date of Grant: 04/20/2004 Application Dated: 04/20/2004 |
| Attention: Joseph Cheung |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | PKTNODEBDZ |
| Name of Grantee: | General Dynamics Broadband, Inc. |
| Equipment Class: | Licensed Non-Broadcast Station Transmitter |
| Notes: | Wireless Broadband Base Station |
| Modular Type: | Does not apply |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| 21 | 2503.0 - 2683.0 | 9.33 | 0.01 % | 4M2G7D | |
| 74 | 2503.0 - 2683.0 | 9.33 | 0.01 % | 4M2G7D | |
| 21 | 2506.0 - 2680.0 | 4.79 | 0.01 % | 8M2G7D | |
| 74 | 2506.0 - 2680.0 | 4.79 | 0.01 % | 8M2G7D |
| The antenna(s) used for this transmitter are to be fixed-mounted on outdoor permanent structures with a separation distance of at least 6 meters from all persons during normal operation.The peak conducted output power at each antenna terminal must not exceed 9.33W and the peak radiated output power must not exceed 933.25W EIRP. Users and installers must be provided with appropriate antenna installation instructions and transmitter operating conditions, including antenna co-location requirements of Part1.1307(b)(3), for satisfying RF exposure compliance. |
| Mail To: |