FCC ID Q78-880280

CDMA Basestation

by ZTE Corporation

Grantee Code: Q78   Product Code: 880280
Latest application date: 2012-01-06

FCC ID Device Details

FCC IDQ78-880280
Mirrorsfcc.id | gov | fccid.ai
Grantee CodeQ78
Product Code880280
Applicant BusinessZTE Corporation 🇨🇳
Related Domains zte.com.cn
Equipment ClassCDMA Basestation
Test FirmZTETS EMC Shenzhen Laboratory

Operating Frequencies

Frequency RangeApplication PurposeFinal Action Date
869.82-888.24 MHzOriginal Equipment2012-01-06

Exhibits

DocumentTypeAvailableFile
User manualUsers Manual2012-01-06PDF 2.6 MB
Internal photosInternal Photos2012-01-06PDF 2.1 MB
External photosExternal Photos2012-01-06PDF 1.3 MB
LabelID Label/Location Info2012-01-06PDF 50.5 KB
Label locationID Label/Location Info2012-01-06PDF 1,006.4 KB
Circuit DescriptionOperational Description2012-01-06PDF 225.5 KB
Part 22 reportTest Report2012-01-06PDF 2.4 MB
Agents letterCover Letter(s)2012-01-06PDF 31.7 KB
Confidentiality letterCover Letter(s)2012-01-06PDF 58.9 KB

Application Information

Application IDWVhlr3N1tvMRzResOcYItQ==
Final Action Date2012-01-06
Application PurposeOriginal Equipment
Applicant FRN0009043175
Model-880280
Frequency Range869.82-888.24 MHz
Equipment ClassTNB - Licensed Non-Broadcast Station Transmitter
Device DescriptionCDMA Basestation
Responsible PartyRoyce Wang, Product Certification Manager, wang.zhihui@zte.com.cn , 0086-755-26770345
AgentLouis Louis Louis, TUV SUD China Shenzhen Branch, louis.lin@tuv-sud.cn , +8675533323289
Test FirmBright Xie, ZTETS EMC Shenzhen Laboratory, xie.yuming@zte.com.cn , 86-755-26771609
TCB EmailTom.Twynam@babt.com
TCB ScopeB2: General Mobile Radio And Broadcast Services equipment in the following 47 CFR Parts 22 (non-cellular) 73, 74, 90, 95 & 97
Short-Term ConfidentialityNo
Long-Term ConfidentialityYes
Grant DeferralNo
Modular EquipmentDoes not apply
Composite DeviceNo
Composite PartNo
Cognitive RadioNo
Authorization WaiverNo
Authorization Waiver ApprovedNo
Section 5301 CertificationYes
Related OET Knowledge DataBase InquiryNo
Grant CommentsPower output listed is ERP. The transmitter has provision for multi carrier. The first power listed is with one carrier, the second power is with two carriers and the third power is with three carriers. The antenna(s) used for this transmitter must be installed to provide a separation distance of 4m between the antenna and the general population. RF exposure compliance will be addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307 (b)(3).

Applications

Application IDDatePurpose
WVhlr3N1tvMRzResOcYItQ==2012-01-06Original Equipment

Equipment Authorization

FrequencyOutputToleranceEmissionRules
869.82-888.24 MHz0.581.5ppm1M23F9W22H
869.82-888.24 MHz0.591.5ppm1M23F9W22H
869.82-888.24 MHz0.551.5ppm1M23F9W22H

Grants

TCB Grant - Application WVhlr3N1tvMRzResOcYItQ==

TCB GRANT OF EQUIPMENT
AUTHORIZATION
TCB
Certification
Issued Under the Authority of the
Federal Communications Commission
By:

  TUV SUD BABT
Octagon House, Concorde Way, Segensworth North,
Fareham, PO15 5RL
United Kingdom
Date of Grant: 01/06/2012

Application Dated: 01/06/2012
ZTE Corporation
ZTE Plaza, Hi-tech Park, Nanshan District,
Shenzhen, Guangdong, 518057
China
 
Attention: Royce Wang , Product Certification Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  Q78-880280
Name of Grantee:  ZTE Corporation
Equipment Class: Licensed Non-Broadcast Station Transmitter
Notes: CDMA Basestation
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
22H 869.82  -  888.24 0.58 1.5  PM 1M23F9W
22H 869.82  -  888.24 0.59 1.5  PM 1M23F9W
22H 869.82  -  888.24 0.55 1.5  PM 1M23F9W

Power output listed is ERP. The transmitter has provision for multi carrier. The first power listed is with one carrier, the second power is with two carriers and the third power is with three carriers. The antenna(s) used for this transmitter must be installed to provide a separation distance of 4m between the antenna and the general population.

RF exposure compliance will be addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307 (b)(3).


EAS Grant - Application WVhlr3N1tvMRzResOcYItQ==

COPY FEDERAL COMMUNICATIONS
COMMISSION
WASHINGTON, D.C. 20554

GRANT OF EQUIPMENT
AUTHORIZATION
COPY
Certification

ZTE Corporation
ZTE Plaza, Hi-tech Park, Nanshan District,
Shenzhen, Guangdong, 518057
China
  Date of Grant: 01/06/2012

Application Dated: 01/06/2012
 
Attention: Royce Wang , Product Certification Manager

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  Q78-880280
Name of Grantee:  ZTE Corporation
Equipment Class: Licensed Non-Broadcast Station Transmitter
Notes: CDMA Basestation
Modular Type: Does not apply
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
22H 869.82  -  888.24 0.58 1.5  PM 1M23F9W
22H 869.82  -  888.24 0.59 1.5  PM 1M23F9W
22H 869.82  -  888.24 0.55 1.5  PM 1M23F9W

Power output listed is ERP. The transmitter has provision for multi carrier. The first power listed is with one carrier, the second power is with two carriers and the third power is with three carriers. The antenna(s) used for this transmitter must be installed to provide a separation distance of 4m between the antenna and the general population.

RF exposure compliance will be addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307 (b)(3).



Mail To: