FCC ID RGTKBHC-1

HANARO CAM

by Kubong Information Technology Co., Ltd.

Grantee Code: RGT   Product Code: KBHC1
Latest application date: 2003-09-11

FCC ID Device Details

FCC IDRGTKBHC-1
Mirrorsfcc.id | gov | fccid.ai
Grantee CodeRGT
Product CodeKBHC1
Applicant BusinessKubong Information Technology Co., Ltd. 🇰🇷
Related Domains kbit.co.kr
Equipment ClassHANARO CAM
Test FirmKorea Standard Quality Laboratories

Exhibits

DocumentTypeAvailableFile
USERS MANAUALUsers Manual2003-09-11PDF 1 MB
INTERNAL PHOTOSInternal Photos2003-09-11PDF 437.1 KB
EXTERNAL PHOTOSExternal Photos2003-09-11PDF 223.2 KB
ID LABEL SAMPLE AND LOCATIONID Label/Location Info2003-09-11PDF 117 KB
BLOCK DIAGRAMBlock Diagram2003-09-11PDF 119.9 KB
TEST SETUP PHOTOSTest Setup Photos2003-09-11PDF 217.6 KB
TEST REPORTTest Report2003-09-11PDF 1.2 MB

Application Information

Application ID7nKpz+uNAM5W5HSsoECM3A==
Final Action Date2003-09-11
Application PurposeOriginal Equipment
Applicant FRN0009525155
ModelKBHC-1
Equipment ClassJBP - Part 15 Class B Computing Device Peripheral
Device DescriptionHANARO CAM
Responsible PartyMoo Hee Park, mhpark@kbit.co.kr , 82-53-382-3803
Test FirmSung-goo Kim, Korea Standard Quality Laboratories, info@ksqlab.com , 82-31-356-7333
TCB EmailTEI@TIMCOENGR.COM
TCB ScopeA1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
Short-Term ConfidentialityNo
Long-Term ConfidentialityNo
Grant DeferralNo
Modular EquipmentDoes not apply
Composite DeviceNo
Composite PartNo
Cognitive RadioNo
Authorization WaiverNo
Authorization Waiver ApprovedNo
Section 5301 CertificationYes
Related OET Knowledge DataBase InquiryNo

Applications

Application IDDatePurpose
7nKpz+uNAM5W5HSsoECM3A==2003-09-11Original Equipment

Equipment Authorization

RulesGrant Notes
15BCE

Grants

TCB Grant - Application 7nKpz+uNAM5W5HSsoECM3A==

TCB GRANT OF EQUIPMENT
AUTHORIZATION
TCB
Certification
Issued Under the Authority of the
Federal Communications Commission
By:

  Timco Engineering, Inc.
849 NW State Road 45
Newberry, FL 32669
Date of Grant: 09/11/2003

Application Dated: 09/11/2003
Kubong Information Technology Co., Ltd.
#1812, Sankyuk-2Dong, Buk-Gu
Daegu,
South Korea
 
Attention: Moo Hee Park

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  RGTKBHC-1
Name of Grantee:  Kubong Information Technology Co., Ltd.
Equipment Class: Part 15 Class B Computing Device Peripheral
Notes: HANARO CAM
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
CE 15B  - 


CE: This device has shown compliance with the conducted emissions limits in 15.107, 15.207, or 18.307 adopted under FCC 02-157 (ET Docket 98-80). The device may be marketed after July 11, 2005, and is not affected by the 15.37(j) or 18.123 transition provisions.

EAS Grant - Application 7nKpz+uNAM5W5HSsoECM3A==

COPY FEDERAL COMMUNICATIONS
COMMISSION
WASHINGTON, D.C. 20554

GRANT OF EQUIPMENT
AUTHORIZATION
COPY
Certification

Kubong Information Technology Co., Ltd.
#1812, Sankyuk-2Dong, Buk-Gu
Daegu,
South Korea
  Date of Grant: 09/11/2003

Application Dated: 09/11/2003
 
Attention: Moo Hee Park

NOT TRANSFERABLE
EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below.
 
FCC IDENTIFIER:  RGTKBHC-1
Name of Grantee:  Kubong Information Technology Co., Ltd.
Equipment Class: Part 15 Class B Computing Device Peripheral
Notes: HANARO CAM
Modular Type: Does not apply
Grant Notes  FCC Rule Parts Frequency
Range (MHZ)
Output
Watts
Frequency
Tolerance
Emission
Designator
CE 15B  - 


CE: This device has shown compliance with the conducted emissions limits in 15.107, 15.207, or 18.307 adopted under FCC 02-157 (ET Docket 98-80). The device may be marketed after July 11, 2005, and is not affected by the 15.37(j) or 18.123 transition provisions.

Mail To: