FCC ID WH7A8000
GSM/GPRS module
by Shanghai Longcheer Technology Co., Ltd.
Grantee Code: WH7 Product Code: A8000
Latest application date: 2009-07-22
FCC ID Device Details
| FCC ID | WH7A8000 |
|---|---|
| Mirrors | fcc.id | gov | fccid.ai |
| Grantee Code | WH7 |
| Product Code | A8000 |
| Applicant Business | Shanghai Longcheer Technology Co., Ltd. 🇨🇳 |
| Related Domains | |
| Equipment Class | GSM/GPRS module |
| Test Firm | Compliance Certification Services Inc. |
Operating Frequencies
| Frequency Range | Application Purpose | Final Action Date |
|---|---|---|
| 824.2-848.8 MHz | Original Equipment | 2009-07-22 |
Exhibits
| Document | Type | Available | File |
|---|---|---|---|
| user manual | Users Manual | 2009-07-22 | PDF 239.2 KB |
| internal photo | Internal Photos | 2009-07-22 | PDF 219.9 KB |
| external photo | External Photos | 2009-07-22 | PDF 123.3 KB |
| Label Info | ID Label/Location Info | 2009-07-22 | PDF 56.8 KB |
| test setup photo | Test Setup Photos | 2009-07-22 | PDF 104.5 KB |
| Test report | Test Report | 2009-07-22 | PDF 1.3 MB |
| antenna spec | Attestation Statements | 2009-07-22 | PDF 202.7 KB |
| Confidentiality request letter | Cover Letter(s) | 2009-07-22 | PDF 102.3 KB |
| POA | Cover Letter(s) | 2009-07-22 | PDF 99.5 KB |
| module letter | Cover Letter(s) | 2009-07-22 | PDF 45.2 KB |
| BOM | Parts List/Tune Up Info | 2009-07-22 | PDF 43.2 KB |
| MPE | RF Exposure Info | 2009-07-22 | PDF 109.1 KB |
| PCB layout | Parts List/Tune Up Info | 2009-07-22 | PDF 305.7 KB |
| tune up procedure | Parts List/Tune Up Info | 2009-07-22 | PDF 27.7 KB |
Application Information
| Application ID | arCnbsIFSNio9bw1hwaKaQ== |
|---|---|
| Final Action Date | 2009-07-22 |
| Application Purpose | Original Equipment |
| Applicant FRN | 0017938887 |
| Model | A8000 |
| Frequency Range | 824.2-848.8 MHz |
| Equipment Class | PCB - PCS Licensed Transmitter |
| Device Description | GSM/GPRS module |
| Responsible Party | Bin Zhi, Test Dept Supervisor, zhibin@longcheer.net |
| Technical Contact | Landy Sung, Compliance Certification Services Inc., landy.sung@ccsrf.com |
| Test Firm | Kurt Chen, Compliance Certification Services Inc., kurt.chen@tw.ccsemc.com |
| TCB Email | bentje.holger@phoenix-testlab.de |
| TCB Scope | B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 & 27 |
| Short-Term Confidentiality | No |
| Long-Term Confidentiality | Yes |
| Grant Deferral | No |
| Modular Equipment | Limited Single Modular Approval |
| Composite Device | No |
| Composite Part | No |
| Cognitive Radio | No |
| Authorization Waiver | No |
| Authorization Waiver Approved | No |
| Section 5301 Certification | Yes |
| Related OET Knowledge DataBase Inquiry | No |
| Grant Comments | Output power listed is conducted; highest radiated power measured in specific configurations shown in filing is Part 22 ERP 0.857W, Part 24 EIRP 0.429W. Limited modular approval for use as a module in mobile or fixed exposure conditions; antenna gain must not exceed 0dBi for 850MHz/Cellular band and 1900MHz/PCS band, for purposes of 2.1043 and 2.1091; the antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons. The antenna(s) used for this transmitter must not be collocated or operating in conjunction with any other antenna or transmitter within a host device, except in accordance with FCC multi-transmitter product procedures. Compliance of this device in all final product configurations is the responsibility of the Grantee. This transmitter is approved for use in configurations specified in the application filing. Operating and installation requirements must be provided. Additional equipment authorization is required for changes that result in the need for SAR evaluation. |
Applications
| Application ID | Date | Purpose |
|---|---|---|
| arCnbsIFSNio9bw1hwaKaQ== | 2009-07-22 | Original Equipment |
Equipment Authorization
Grants
TCB Grant - Application arCnbsIFSNio9bw1hwaKaQ==
| TCB | GRANT OF EQUIPMENT AUTHORIZATION |
TCB |
| Certification | ||
| Issued Under the Authority of the | ||
| Federal Communications Commission | ||
| By: |
|
PHOENIX TESTLAB GmbH Koenigswinkel 10 32825 Blomberg, Germany |
Date of Grant: 07/22/2009 Application Dated: 07/22/2009 |
| Shanghai Longcheer Technology Co., Ltd. |
| Building 1, No.401 Caobao RD ,Xuhui District, |
| Shanghai, 200233 China |
| Attention: Bin Zhi , Test Dept Supervisor |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | WH7A8000 |
| Name of Grantee: | Shanghai Longcheer Technology Co., Ltd. |
| Equipment Class: | PCS Licensed Transmitter |
| Notes: | GSM/GPRS module |
| Modular Type: | Limited Single Modular |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| 22H | 824.2 - 848.8 | 1.294 | 2.5 PM | 245KGXW | |
| 24E | 1850.2 - 1909.8 | 0.5383 | 2.5 PM | 245KGXW |
| Output power listed is conducted; highest radiated power measured in specific configurations shown in filing is Part 22 ERP 0.857W, Part 24 EIRP 0.429W. Limited modular approval for use as a module in mobile or fixed exposure conditions; antenna gain must not exceed 0dBi for 850MHz/Cellular band and 1900MHz/PCS band, for purposes of 2.1043 and 2.1091; the antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons. The antenna(s) used for this transmitter must not be collocated or operating in conjunction with any other antenna or transmitter within a host device, except in accordance with FCC multi-transmitter product procedures. Compliance of this device in all final product configurations is the responsibility of the Grantee. This transmitter is approved for use in configurations specified in the application filing. Operating and installation requirements must be provided. Additional equipment authorization is required for changes that result in the need for SAR evaluation. |
EAS Grant - Application arCnbsIFSNio9bw1hwaKaQ==
| COPY |
FEDERAL COMMUNICATIONS COMMISSION WASHINGTON, D.C. 20554 GRANT OF EQUIPMENT AUTHORIZATION |
COPY |
| Certification |
|
Shanghai Longcheer Technology Co., Ltd. Building 1, No.401 Caobao RD ,Xuhui District, Shanghai, 200233 China |
Date of Grant: 07/22/2009 Application Dated: 07/22/2009 |
| Attention: Bin Zhi , Test Dept Supervisor |
| NOT TRANSFERABLE |
| EQUIPMENT AUTHORIZATION is hereby issued to the named GRANTEE, and is VALID ONLY for the equipment identified hereon for use under the Commission's Rules and Regulations listed below. |
| FCC IDENTIFIER: | WH7A8000 |
| Name of Grantee: | Shanghai Longcheer Technology Co., Ltd. |
| Equipment Class: | PCS Licensed Transmitter |
| Notes: | GSM/GPRS module |
| Modular Type: | Limited Single Modular |
| Grant Notes | FCC Rule Parts | Frequency Range (MHZ) | Output Watts | Frequency Tolerance | Emission Designator |
| 22H | 824.2 - 848.8 | 1.294 | 2.5 PM | 245KGXW | |
| 24E | 1850.2 - 1909.8 | 0.5383 | 2.5 PM | 245KGXW |
| Output power listed is conducted; highest radiated power measured in specific configurations shown in filing is Part 22 ERP 0.857W, Part 24 EIRP 0.429W. Limited modular approval for use as a module in mobile or fixed exposure conditions; antenna gain must not exceed 0dBi for 850MHz/Cellular band and 1900MHz/PCS band, for purposes of 2.1043 and 2.1091; the antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons. The antenna(s) used for this transmitter must not be collocated or operating in conjunction with any other antenna or transmitter within a host device, except in accordance with FCC multi-transmitter product procedures. Compliance of this device in all final product configurations is the responsibility of the Grantee. This transmitter is approved for use in configurations specified in the application filing. Operating and installation requirements must be provided. Additional equipment authorization is required for changes that result in the need for SAR evaluation. |
| Mail To: |